![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/Jason-and-coworker-performing-fish-salvage-e1339615950934.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/subgrade-prep-ready-for-Ibeams-e1339615986844.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/setting-foundation-Ibeams-e1339616027353.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/final-tacking-of-plates-e1339616065294.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/DSCN1706-e1339616151681.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/DSCN1707-e1339616384682.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/view-of-the-throat-end-of-screen-e1339616447361.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/screen-being-built-in-shop-e1339616561527.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/IMG_3090-e1339617136864.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/IMG_3153-e1339617335372.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/Downstream-1-e1339617367377-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/Weir-Wall-e1339617451373-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/Screen-e1339617490637-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/Upstream-View-2-e1339617661577-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/Overview-e1339617699464-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/headgate-2-e1339617736971-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/FCA.NorthGreenpoint3-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/06/FCA.NorthGreenpoint1-1.jpg)
This project involved removal of an existing fish screen, removal of a no longer used diversion structure, and construction of a new horizontal Farmers Screen with a new fish return.
The diversion at this creek had a structure that was no longer used and a fish screen that was costly and ineffective. The presence of endangered species made fish protection a key priority for the irrigation district.
The install of a modular Farmers Screen was successful in spite of close working quarters and in-water construction. A new fish-return system ensures the delivery of endangered species back to North Green Point Creek.
We’re a 501c3 nonprofit social enterprise. In partnership with rural communities, we are tirelessly in the pursuit of water management solutions that benefit both agriculture and environment.
© Farmers Conservation Alliance (FCA). All Rights Reserved.
farmers conservation alliance
102 State Street, Hood River, OR 97031
© Farmers Conservation Alliance (FCA). All Rights Reserved.