![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/12/3-Pump-truck-waiting-for-the-concrete-to-arrive-on-site-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/12/4-With-forms-in-place-workers-place-the-concrete-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/12/5-After-the-concrete-has-had-time-to-cure-the-FCA-screen-arrives-on-site-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/12/6-Tight-working-area-installing-the-screen-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/12/7-Installing-the-taper-wall-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/12/8-Looking-down-the-entrance-flume.-The-sediment-flush-gate-in-the-foreground-1.jpg)
![](https://fcaredesign.wpenginepowered.com/wp-content/uploads/2012/12/9-Only-thing-left-is-for-the-water-district-to-connect-the-screen-to-their-mainline-1.jpg)
This diversion is a crucial link to the drinking water supplied to 1,100 households near Corbett, Oregon.
The diversion was failing due to a passive vertical screen that was out of compliance and could not handle high levels of debris present in the creek in the fall and spring.
FCA installed a comprehensive new screening system, including a Farmers Screen that was custom fit to an existing concrete structure. The new system includes: